7 Initial Start-up
7.1 Safety
Here you will find instructions for safe commissioning of the machine.
Warning instructions are located before a potentially dangerous task.
Basic safety instructions
1. Follow the instructions in chapter "Safety and Responsibility".
2. Commissioning work may only be carried out by authorized operating and maintenance person‐
nel.
Further information Information on authorized personnel are found in chapter 3.4.2.
Information on dangers and their avoidance are found in chapter 3.5.
7.2 Instructions to be observed before commissioning or recommission‐
ing
The initial start-up of every machine takes place at the factory. Every machine is also given a
trial run and passes a careful check.
Incorrect or improper commissioning can cause injury to persons and damage to the machine.
➤ Commissioning may only be carried out by authorized installation and service personnel who
have been trained on this machine.
➤ Remove all packing materials and tools on and in the machine.
➤ Observe the machine during the first few hours of operation to ensure that it is operating correctly.
7.3 Checking installation and operating conditions
➤ Check and confirm all the items in the checklist before starting the machine.
Function
See chapter Confirmed?
➤ Are the operators fully conversant with safety regulations?
–
➤ Have all the positioning conditions been fulfilled?
➤ Is there sufficient cooling oil in the separator tank?
➤ Is there sufficient oil in the engine?
➤ Is the maintenance indicator on the air intake filters (engine and com‐
pressor) OK?
➤ Is there sufficient coolant in the coolant expansion tank?
➤ Is there sufficient fuel in the fuel tank?
–
➤ Fuel prefilter water trap emptied?.
➤ Are the access doors closed and all body panels in place?
–
➤ Are the tyre pressures OK?
–
Tab. 62 Installation and operating conditions checklist
7
Initial Start-up
7.1
Safety
No.: 9_6975 00 E
Service Manual Screw Compressor
M135 SIGMA CONTROL MOBIL
63