Installation Instructions Powador 1501xi/2501xi*/3501xi/4501xi/5001xi**_EN
Page 3
For authorised electricians
Installation Instructions
Powador 1501xi/2501xi*/3501xi/4501xi/5001xi**
* available only in France
** available only in Korea and Spain
1
About This Documentation ........................................4
1.1 Retention of documents .............................................4
1.2 Symbols used in this document ..................................4
1.3 CE
marking................................................................4
1.4 Name
plate
...............................................................4
2
Safety Instructions and Regulations ..........................5
3
Notes on Installation and Operation ...........................6
3.1 Intended
use
.............................................................6
3.2 Factory warranty and liability .....................................6
3.3 Service
......................................................................6
4 Technical
Data
...........................................................7
5 Device
Description
................................................... 11
5.1 Scope of delivery ..................................................... 11
5.2 Dimensioning the PV generator ................................ 11
5.3 Protection
concepts
.................................................12
6
Installation and Start-up ..........................................12
6.1 Selecting an appropriate place for installation ..........12
6.2 Installing the inverter ...............................................13
6.3 Electrical
connection
................................................13
6.4 Connecting the fault signal relay ..............................17
6.5 The S0 output connection ........................................17
6.6 The RS485 interface connection ..............................17
6.7 Starting up the inverter ............................................18
6.8 Parameter
programming ..........................................19
7
Switching the Inverter Off ........................................21
8 Troubleshooting
.......................................................22
9 Documents
.............................................................24
9.1 EU Declaration of Conformity ...................................24
9.2 Certifi cate of compliance .........................................25