Table 14 on page 28
provides information on the clearance requirements for maintaining
the optimum airflow and the distances for facilitating easy maintenance of the device.
Table 14: Clearance Requirements for the SRX100 Services Gateway
Requirement for Clearance
Recommended
Clearance
Location
Space for service personnel to
remove and install hardware
components
2.5 in. (6.35 cm)
Front of the chassis
Space for service personnel to
remove and install hardware
components
2.5 in. (6.35 cm)
Rear of the chassis
Space for cable management and
organization
2.5 in. (6.35 cm)
Between front-mounting flange
and rack or cabinet edge
Space for the cooling system to
function properly and to maintain
unrestricted airflow around the
chassis
2.5 in. (6.35 cm)
Between side of the chassis and
any non-heat-producing
surface such as a wall or
cabinet side
Space for the cooling system to
function properly and to maintain
unrestricted airflow around the
chassis
0.4 in. (1 cm)
Between side of the chassis and
devices that have fans or
blowers
NOTE:
The air vents are provided on the sides of the chassis for the SRX100
Services Gateway.
Related
Documentation
•
General Site Guidelines for Installing the SRX100 Services Gateway on page 24
•
SRX100 Services Gateway Cabinet Requirements on page 25
•
SRX100 Services Gateway Rack Requirements on page 26
Copyright © 2015, Juniper Networks, Inc.
28
SRX100 Services Gateway Hardware Guide for B and H Model Numbers