5. Remove the cables that connect to all external devices.
6. If the services gateway is installed in a rack, have one person support the weight of the services gateway
while another person unscrews and removes the mounting screws.
7. Place the services gateway in the shipping carton.
8. Cover the services gateway with an ESD bag, and place the packing foam on top of and around the
device.
9. Replace the accessory box on top of the packing foam.
10. Securely tape the box closed.
11. Write the Return Materials Authorization (RMA) number on the exterior of the box to ensure proper
tracking.
Packing the SRX4600 Services Gateway Components for Shipment
Follow these guidelines for packing and shipping individual components of the services gateway:
•
When you return a component, make sure that it is adequately protected with packing materials and
packed so that the pieces are prevented from moving around inside the carton.
•
Use the original shipping materials if they are available.
•
Place the individual component in an electrostatic bag.
•
Write the Return Materials Authorization (RMA) number on the exterior of the box to ensure proper
tracking.
CAUTION:
Do not stack any of the services gateway components during packing.
146
Summary of Contents for SRX-4600
Page 1: ...SRX4600 Services Gateway Hardware Guide Published 2020 02 28 ...
Page 18: ......
Page 42: ......
Page 62: ......
Page 82: ......
Page 122: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX4600 127 ...
Page 123: ......
Page 134: ......
Page 147: ...151 ...
Page 150: ...Restricted Access Area Warning 154 ...
Page 157: ...161 ...
Page 170: ...Jewelry Removal Warning 174 ...
Page 173: ...Operating Temperature Warning 177 ...
Page 183: ...DC Power Disconnection Warning 187 ...
Page 187: ...DC Power Wiring Sequence Warning 191 ...
Page 190: ...DC Power Wiring Terminations Warning 194 ...
Page 193: ...DC Power Disconnection Warning 197 ...
Page 197: ...DC Power Wiring Sequence Warning 201 ...