A
O
J
P
L
B
A
11
H
A
B
Step 10
Slide in “PVC Sleeve” O into “Upper Frame Tube with Long Foam” A . Please make sure the tie
on the upper part of the Sleeve is on the top. Secure the top opening of the Sleeve with a tie.
Then slide the Cable Wire in to the “Plastic Cap” J assembled on the Upper Frame Tube with
Long Foam. Make sure the cable wire fits into the slot properl . Pull down the PVC Sleeve O to
cover up all the foam as shown.
Finally, put the ”Cap” P onto the “Plastic Cap” J .
Repeat for all tubes.
Step 11
Now lift the assembled “RING” up to attach the “Upper Frame Tube with Long Foam” A to the
“Middle Frame Tube with Foam” B .
Make sure all legs are in place before securing with the “Self-Locking Screw” H .
11