
19
7 Installation
7.2 Connection diagram
After the supply voltage has been applied, the instrument will
operate according to the factory-set parameters (unless the
instrument was ordered with “controller off”).
It is therefore advisable to program the instrument as required
before connecting the actuators
.
Chapter 9 “Operation”, page 23ff.
18
17
19
21
20
23
22
L1
(L+)
TE
N
(L-)
12
13
10
11
15
16
14
2
1
3
8
9
7
6
4
5
Outputs
K
Terminal assignments
Symbol
Relay 1
(K1)
Status indication
LED K1
1
23
22
common
make
Relay 2
(K2)
Status indication
LED K2
2
21
20
common
make
Relay 3
(K3)
Status indication
LED K3
or
process value output
(electrically isolated)
3
16
15
14
break
common
make
15
14
–
+
P
S
23
22
P
S
21
20
P
Ö
S
15
16
14
14
15
+
-