![JUKI DP-2100 Instruction Manual Download Page 146](http://html.mh-extra.com/html/juki/dp-2100/dp-2100_instruction-manual_2029747146.webp)
−
140
−
2
1
17-2 Inputting the inspection time
7
4)
Display the threading diagram.
When threading button
7
displayed in the
maintenance and inspection screen is pressed, the
needle thread threading diagram is displayed.
Observe it when performing threading.
1)
Display the information screen (maintenance
personnel level).
When information key
1
of the switch seat
section is pressed in the data input screen for
approximately three seconds, information screen
(maintenance level) is displayed.In case of the
maintenance personnel level, the pictograph
located on the upper left side changes from blue
to orange, and five buttons are displayed.
2)
Display the maintenance and inspection
information screen.
Press maintenance and inspection information
screen display button
2
in the information
screen.
*
For the two buttons displayed in the bottom stage
at the time of the maintenance personnel level,
refer to
"23 DInformation screen of the
maintenance personnel level"
.
Summary of Contents for DP-2100
Page 1: ...i ENGLISH INSTRUCTION MANUAL ...
Page 24: ... 18 5 3 Details data input screen 8 7 L M N 0 1 2 3 4 5 9 6 2 3 ...
Page 35: ... 30 5 6 5 Press ENTER button 5 6 Press CANCEL button 6 ...
Page 43: ... 38 5 7 6 5 Press STEP DELETION button 5 6 Press ENTER button 6 7 Press CANCEL button 7 ...
Page 46: ... 41 5 6 5 Press ENTER button 5 6 Press CANCEL button 6 ...
Page 69: ... 63 5 6 5 Press ENTER button 5 6 Press CANCEL button 6 ...
Page 79: ... 73 6 Press CANCEL button 7 7 ...
Page 85: ... 79 5 Press CANCEL button 5 5 3 3 Press MIRRORING button 3 4 Press ENTER button 4 4 ...
Page 186: ... 180 26 3 Edge stopper A Part No 40013087 15 7 5 26 630 275 0 5 275 0 5 40 3 x ø 2 5 depth 14 ...