JUDO BIOSTAT-COMBIMAT
13
Operation
5.
Operation
ATTENTION
(see chapter “Safety information and
dangers due to non-compliance”)
Always observe the chapter “Intended use”!
5.1
Commissioning
For safety reasons, the water treatment
device must be
vented
immediately
upon
connection to the water supply.
–
Turn the bypass valve, if installed, to the
position “activated” (in operation) (see
chapter “Mounting the bypass valve
(accessories)”).
–
Turn on a water tap mounted after the
water treatment device.
The power supply must be freely accessible.
–
Connect the water treatment device to
the power supply. Thereto, plug the
power supply into the socket.
After the power supply has been connected,
the electrical circuit performs a self-check of
all the functions and parameters stored in
the electronics.
Following a successful check, all control
lamps light up for 2 seconds (see chapter
“Control lamps, manual pushbuttons”).
As soon as LED 1 shows a continuous
green light indicating “Operation”, the water
treatment devices is ready for use. When
water is flowing, the green LED 1 flashes
(see chapter “Control lamps, manual push-
buttons”).
Electrical circuit
Fig. 10: Electrical circuit
DIP switch
LEDs
manual
pushbutton
1 5 m³
2 10 m³
3 20 m³
4 40 m³
5 Ox 1
6 Ox 2
7
8
15 V
A
C
(battery)
Batt
er
ie
M
1
(el
e
ctrode)
E
lektrode
S
3
H
a
ll
M
2
A
larm