10
JUDO BIOSTAT-COMBIMAT
Installation
Therefore, when mounting, ensure that no
large forces act on the pipe, built-in rotary
flange and water treatment devices.
4.2.4 Mounting the wall support
For further information, please refer to the
installation instructions for the wall support.
4.2.5 Mounting the water treatment
device without a bypass valve
–
Firstly flush the water pipe with the newly
installed rotary flange (JQE) and block
off the water again (at the main water tap
or blocking valve).
–
Remove the assembly cover of the built-
in rotary flange.
–
Remove the white protector cap on the
connecting flange of the water treatment
device by unscrewing the four M6 Allen
screws.
Do not completely unscrew the screws
because of the bayonet connection!
–
Lift up the water treatment device and
swivel it approx. 30° in an anti-clockwise
direction.
–
Position it on the built-in rotary flange so
that the screw heads pass through the
bayonet fixing drill holes (see fig. 6 I).
–
Swivel the water treatment device
approx. 30° back in a clockwise direction
and tighten the four Allen screws (see
fig. 6 II).
Fig. 4: Wall support without bypass valve
Fig. 5: Wall support with bypass valve
wall support
wall support
Select the torque (approx. 4 Nm) so
that the gasket closes and the water
treatment device is not damaged or
strained!
Fig. 6: Built-in rotary flange with bayonet fixture
I
II