JST
CMKS-L INDUSTRY STANDARD APPLICATOR
H:\0 - Quality Documents\2 Department\Tech Serv\Application tooling\Applicators and Die sets\TS174-00
CMKS-L Manual.doc
5
3. UPPER DIE PARTS
3.1 ASSEMBLING UPPER DIE PARTS
To ensure the upper die parts are assembled in the correct orientation the engraved
part numbers must always be facing outwards.
The parts must be fitted in the correct order as detailed below:
1.
Conductor spacer (146)
2.
Insulation spacer (148)
3.
Block ring (113)
After you have fitted these parts tighten them down with a 5mm-hexagon screw and
check that they are not clamped and move up and down freely.
4.
Punch spacer (147)
5.
Conductor punch (144)
6.
Insulation punch (145)
7.
(A Spacer & wire spring are sometimes fitted between the two punches).
8.
Punch ring spacer (163)
9.
Ejector (159)+ (160)
After you have fitted these parts, tighten down with a 6mm-hexagon screw and
again check that they are not clamped and punches move up and down freely.
3.2 TROUBLE SHOOTING
The punches or spacers do not move freely
1.
Dismantle and check for any foreign bodies.
2.
Check the sides of the punches for wear / damage or burrs.
3.
Check the parts that are fitted, against the relevant die construction sheet.