ACU-5000 Operations Manual
9-4
Interoperability Now
In the previous screen shot, the Net 3 icon and the net line are both still dark green to indicate
that channel building operation is still active and other channels can be quickly added to the
net. After clicking on radio channel number 5 (to add channel 5 to the net), and again on Net 3
(to deselect Net 3 and terminate the net building process), the Net control page has three
operational nets:
Summary of Contents for ACU-5000
Page 8: ...ACU 5000 Operations Manual 8 Interoperability Now blank page...
Page 22: ...ACU 5000 Operations Manual 2 6 Interoperability Now End of Section 2...
Page 38: ...ACU 5000 Operations Manual 4 12 Interoperability Now End of Section 4...
Page 40: ...ACU 5000 Operations Manual 5 2 Interoperability Now...
Page 46: ...ACU 5000 Operations Manual 5 8 Interoperability Now...
Page 62: ...ACU 5000 Operations Manual 6 12 Interoperability Now End of Section 6...
Page 86: ...ACU 5000 Operations Manual 10 2 Interoperability Now End of Document...