31
ENGLISH
8.
Remove the flame-breaker
To remove the flame-breaker (
Fig. 23),
inside the combustion
chamber, lift it to move it from side supports and bending its
left side part, by accompanying it carefully downwards, until the
piece is totally out of the combustion chamber (
Fig. 24-25-26
).
Clean the flame-breaker by removing the deposited ashes.
9.
Connecting the power socket
Before connecting the plug on the cord supplied with the stove
to the domestic electrical system, plug it into the socket fitted on
the back of the stove (
Fig.
27)
After plugging it into the domestic electrical system, turn the
switch to “I” (see
Fig
. 28).
10. Pellet hopper loading
Located on the rear part of the device, the hopper is filled
through an openable lid. The hopper must be filled with pellets
using a shove (not supplied) (
Fig. 29-30
) and not poured in
directly from the bag.
11.
Fume inspection cleaning
Remove the inspection cover under the ash pan and clean
carefully this space.
Use the ash vacuum spout to suction all the residual ash left at
the bottom of the exchanger entering the inspection hatch with
the ash vacuum handle (make sure residual ashes are cold)
(
Fig. 31-32-33).
After cleaning, place the inspection cover as installed previously.
Fig. 23
Fig. 25
Fig. 26
Fig. 24
Fig. 27
Fig. 28
Fig. 29
Fig. 30
Fig. 31
Fig. 32
Fig. 33
Summary of Contents for AMBRIA2 10 kW
Page 18: ...18 06 4 DIMENSIONS All measurements are in mm C A B AMBRIA2 10 kW A 461 5 B 1073 C 487 8 ...
Page 37: ...37 ENGLISH NOTES ...
Page 38: ...38 NOTES ...
Page 39: ...39 ENGLISH NOTES ...