22
07.4
ASSEMBLY SEQUENCE
1. Unpack the stove by removing the cardboard. Place the stove in the location where you want to install it. When choosing the
place to install it, remember that installation must guarantee easy access to clean the stove, the fume pipes and the flue, and
that the safety distances must be complied with as provided for in
CHAP.06.1 – HOMOLOGATION
.
2.
For assembling the cladding please see the specific annexes (see AD126).
3. The stove may function by taking the combustion air directly from the outside (see paragraph 07.3 for the external combustion air
canalisation characteristics) or from the inner part of the installation room (in this case, a ventilation opening needs to be designed,
in compliance with the specifications in paragraph 07.3).
4. All models may be connected to the fume pipes with rear fume outlet (
Fig.1
)
.
For the construction of fume pipes please comply with
the specifications in CHAP. 07.2.
07.5
ELECTRICAL CONNECTIONS
Connect the 230Vac 50Hz line with the proper cable with plug, supplied with the stove, which powers up the control unit and all the
appliance’s electrical components
The device is equipped with a power socket with fuses and a bipolar switch.
In the event that the control unit does not switch on, even after turning the switch to I “ONE”, check that the fuses are intact.
1.
Control unit
2.
Earth
3.
Power socket with cord included
4.
Switch
5.
Fuse Ø5X20 F4A 250V IEC 127-II
Electrical connections must be carried out by skilled personnel according to the regulations in force (2014/30/UE
and 2014/35/UE).
WARNING
Fig. 1
5
Summary of Contents for AMBRIA2 10 kW
Page 18: ...18 06 4 DIMENSIONS All measurements are in mm C A B AMBRIA2 10 kW A 461 5 B 1073 C 487 8 ...
Page 37: ...37 ENGLISH NOTES ...
Page 38: ...38 NOTES ...
Page 39: ...39 ENGLISH NOTES ...