ASSEMBLY INSTRUCTIONS
Pag. 6
POSITIONING OF THE AIR INTAKE AND ELECTRICITY
To make installation of the fireplace easier, fit all the external
air vents, the two distribution boxes with wiring beforehand
and the flexible sheath for electrical cables in the positions
shown in the diagram.
The positions shown in the diagrams are valid for the three
models (70 - 80 - 100) both when wall or corner positioned.
Leave two stretches of flexible sheath sticking out from the
wall (by about 50/70 cm) to allow for the electrical connections.
We recommend respecting the indicated measures.
If the fireplace is to have a side seat, the electrical plant
must be installed on the opposite side.
All air intakes as well as electrical connections may be
moved, provided the characteristics remain unchanged.
A
- Current distribution box, connection
with B box and connection with ventilator
B
- distribution box for control unit connection
C
- Free air intake for ventilator and hood
ventilation ø 200 (see optional pag. 5)
D
- Omnipolar circuit breaker
WALL POSITIONING
CORNER POSITIONING
fireplace centre line
fireplace centre line
line 220V
line 220V