32
E1 -
Reverse Elevation Pot
Error 1
Enter engineer mode of
“MANUAL
CALIBRATION”
screen
Check the “P13 ELV
DIRECTION” screen
whether set to “Yes”
Set to “Yes”
AUTO-
Calibration
Enter the “P4 ELEVATION
MINIMUM” screen
whether parameter set is
30 2
AUTO-
Calibration
Enter the “P5
ELEVATION
MAXIMUM ” screen
whether parameter set is
240 5
AUTO-
Calibration
Step 1. Calibrate Elevation
Calibrate the elevation as outlined in the System Calibration Procedure in below step.
Step 2. CORRECTIVE ACTION
1.Ensure correct signal is being sent to interface board (MCB) by pressing elevation
up/down keys by observing elevation LED’s correctly corresponding to correct
elevation keys pressed (please refer the 29 page) . If failure occurs for this step check
console cable and then the interface board (MCB).
2.Check failed elevation motor, interface board, console cable with a known good
console.
Summary of Contents for Vision T9800HRT
Page 1: ...1 Vision T9800HRT Service Manual...
Page 3: ...3 SECTION 1 MAINTENANCE PROCEDURE...
Page 9: ...9 SECTION 2 WIRING DIAGRAM INSTRUCTION...
Page 16: ...16 T9800 TM87 Electrical block diagram for 110V...
Page 17: ...17 T9800 TM87 WIRING DIAGRAM INSTRUCTION for 110V...
Page 18: ...18 T9800 TM87 Electrical block diagram for 220V...
Page 19: ...19 T9800 TM87 WIRING DIAGRAM INSTRUCTION for 220V...
Page 20: ...20 SECTION 3 CONSOLE FUNCTIONAL FLOW DIAGRAM...
Page 21: ...21 OPERATING T9800...
Page 27: ...27 SECTION 4 MCB LED INSTRUCTIONS...
Page 28: ...28 AC FAN...
Page 30: ...30 SECTION 5 TROUBLESHOOTINGS...