2
TABLE OF CONTENTS
SECTION 1: MAINTENANCE PROCEDURE
…………………
3
1. MAINTENANCE CHECK LIST………………………..............................4
2. TENSIONING THE BELT PROCEDURE………………………….……..5-6
3. DECK RE-WAXING PROCEDURE………………………………….……7
4. CLEAN THE GROOVES PROCEDURE…………….................................8
SECTION 2: WIRING DIAGRAM INSTRUCTION
……………….9
1. T9800(TM87) MCB WIRING(FOR 110V / 220V)………………………..10
2. T9800(TM87) MCB WIRING DEFINITION OF PIN…………...………..11-12
3. T9800(TM87) CONSOLE WIRING………………………………………..13
4. T9800(TM87) CONSOLE WIRING DEFINITION OF PIN……………....14-15
5. T9800(TM87) ELECTRICAL BLOCK DIAGRAM FOR 110V……….….16
6. T9800(TM87) WIRING DIAGRAM INSTRUCTION for 110V………..…17
7. T9800(TM87) ELECTRICAL BLOCK DIAGRAM FOR 220V..………….18
8. T9800(TM87) WIRING DIAGRAM INSTRUCTION for 220V…………..19
SECTION 3: CONSOLE FUNCTIONAL FLOW DIAGRAM
……20
1. OPERATION T9800 MANUAL…………………………………………….21
2. OPERATION T9800 MANUAL- Engineer mode……………………..…...22-26
SECTION 4: MCB LED INSTRUCTIONS
……….………
…….….27
1. T9800 MCB LED PLACE AND DEFINITION…………………………….28-29
SECTION 5:
TROUBLESHOOTINGS
………………………………………30
1. T9800 Console Error code …………………………………………..……...31
2. E1
-
Reverse Elevation Pot ………………………………………………….32
3. E2 – Elevation Out Of Range …………………………………………….….33
4. E3 – Elevation Stall ……………………………………….............…………34
5. E5 – Over-speed Error ………………………………...………………….….35
6. E6 – Runaway Belt Error …………………………………………..………..36
7. E7 – Speed Stall Error…...…………………………………………………...37
8. E9 – Speed Range Error …...…………………..…………………….……...38-39
9. Speed Issues .……………………………………………………..…………40
10. Belt Drive Issues………………………………………………………….…41
11. Speed Control Issues……………………………………………….……….42
12. Speed Calibration Issue……………………………………………..………43
13. OPERATION ERRORS…………………………...………………………...44
Summary of Contents for Vision T9800HRT
Page 1: ...1 Vision T9800HRT Service Manual...
Page 3: ...3 SECTION 1 MAINTENANCE PROCEDURE...
Page 9: ...9 SECTION 2 WIRING DIAGRAM INSTRUCTION...
Page 16: ...16 T9800 TM87 Electrical block diagram for 110V...
Page 17: ...17 T9800 TM87 WIRING DIAGRAM INSTRUCTION for 110V...
Page 18: ...18 T9800 TM87 Electrical block diagram for 220V...
Page 19: ...19 T9800 TM87 WIRING DIAGRAM INSTRUCTION for 220V...
Page 20: ...20 SECTION 3 CONSOLE FUNCTIONAL FLOW DIAGRAM...
Page 21: ...21 OPERATING T9800...
Page 27: ...27 SECTION 4 MCB LED INSTRUCTIONS...
Page 28: ...28 AC FAN...
Page 30: ...30 SECTION 5 TROUBLESHOOTINGS...