P5417009-rev.6
37
● Construction Example
The following figures show examples of a heat recovery system (three units in combination).
Regarding the piping work for combining the units, refer to the “Installation and Maintenance Manual”
enclosed in the piping connection kit package. Refer to the following figure to perform the piping
connections between the outdoor units.
Liquid Piping
(Field-Supplied)
High/Low Pressure Gas Piping
(Field-Supplied)
Low Pressure Gas Piping
(Field-Supplied)
Outdoor Unit A
Piping Connection Kit 2
(Liquid)
Outdoor Unit B
Piping Connection Kit 2
(High/Low Pressure Gas)
Piping Connection Kit 2
(Low Pressure Gas)
Liquid Piping
(Field-Supplied)
High/Low Pressure
Gas Piping
(Field-Supplied)
Low Pressure Gas Piping
(Field-Supplied)
Outdoor Unit C
Piping from Bottom Base
Piping Connection Kit 1
(Liquid)
Piping Connection Kit 1
(High/Low Pressure Gas)
Piping Connection Kit 1
(Low Pressure Gas)
Base
(Field-Supplied)
Accesory Pipe
(L-Shape)
Accesory Pipe
(L-Shape)
Accesory Pipe
(Z-Shape)
Accesory Pipe
(Z-Shape)
High/Low Pressure Gas Piping
(Field-Supplied)
Liquid Piping
(Field-Supplied)
Low Pressure Gas Piping
(Field-Supplied)
Piping Connection Kit 1 (Liquid)
Accessory Pipe
Indoor Unit A
Indoor Unit B
Indoor Unit C
Foundation
Low Pressure Gas Piping
(Field-Supplied)
High/Low Pressure Gas Piping
(Field-Supplied)
Liquid Piping
(Field-Supplied)
Piping Connection Kit 2
(High/Low Pressure Gas)
Piping from Front Side Piping Cover
Accessory
Pipe
P
Piping Connection Kit 2 (Liquid)
Piping Connection Kit 2
(Low Pressure Gas)
Piping Connection Kit 1
(High/Low Pressure Gas)
Piping Connection Kit 1
(Low Pressure Gas)
Accessory Pipe
(L-Shape)
Accessory Pipe
(L-Shape)
Foundation
<View from P>
(Min. 500mm)
Accessory
Pipe
Keep the same heights when removing the gas
piping and the liquid piping from the piping cover.
Min. 19-11/16 inches
Connecting Pipe
(Field Supplied)
Connecting Pipe
(Attaching to Piping Connection Kit)
Min. 5-7/8 inches
(Min. 150mm)
● Perform the piping connections between
outdoor units according to the figure.
● Perform the piping connections between
outdoor units according to the figure.