FAI Connections
5–26
iSTAR Ultra Installation and Configuration Guide
Figure 5-22:
FAI with Latch
F and K input Supervision
Although the F and K inputs will work when they are unsupervised, as shown in Figure 5-21
, Software House recommends that you use the
standard Software House method of supervising the inputs. Use parallel/serial for the
normally open K input and use serial/parallel for the normally open F signal.
The wiring is shown in Figure 5-23 on
. Be sure that the resistors are as close as
possible to the F and K switches for the most security.
Figure 5-23:
K and F Supervision
Summary of Contents for tyco iSTAR Ultra
Page 8: ...Table of Contents viii iSTAR Ultra Installation and Configuration Guide...
Page 66: ...Visual Indicators 4 10 iSTAR Ultra Installation and Configuration Guide...
Page 98: ...Readers and Accessory Boards 5 32 iSTAR Ultra Installation and Configuration Guide...
Page 102: ...Overview 6 4 iSTAR Ultra Installation and Configuration Guide...
Page 110: ...Firmware Upgrades 7 8 iSTAR Ultra Installation and Configuration Guide...
Page 118: ...GCM Battery Replacement 8 8 iSTAR Ultra Installation and Configuration Guide...