background image

Installation, Operation and Maintenance Manual : 036-1011(0806)

Page 24

 

Cancel any calls for cooling and wait for the internal 
overload to reset. Test again when cool.

3.  If the compressor contactor 4 is not pulled in, check for 

24 volts at the compressor contactor coil. If 24 volt is 
present and compressor contactor is not pulled in, 
replace the contactor.

4.  Failing the above, if voltage is supplied at the 

compressor contactor 4, and it is pulled in, and the 
compressor still doesn't operate, replace the 
compressor.

5.  If 24 volts is not present at compressor contactor 4, 

check for 24 volts at the UCB terminal, C4. if 24 Volts are 
present, check for loose wiring between C4 and the 
compressor contactor.

6.  If 24 volts is not present at the C4 terminal, check for 24 

volts from the room thermostat at the UCB Y4 terminal. 
If 24 volts is not present from the room thermostat, check 
for the following :

• 

24 volts at the thermostat Y4 terminal.

• 

Proper wiring between the room thermostat and the 
UCB.

• 

Loose Wiring from the room is thermostat to the 
UCB.

7.  If 24 Volts is present at the UCB Y4 terminal, the 

compressor may be out due to an open high pressure 
switch, low pressure switch or freezestat. Check for 24 
volts at the HPS4, LPS4 and FS4 terminals of the UCB. 
If a switch has opened, there should be a voltage 
potential between the UCB terminals e.g., if LPS4 has 
opened, there will be 24 volts of potential between the 
LPS4 terminals.

8.  If 24 volts is present at the UCB Y4 terminal and none of 

the protection switches have opened, the UCB may have 
locked out the compressor for repeat trips. The UCB 
should be flashing a code. If not, press and release the 
ALARMS button on the UCB. The UCB will flash the last 
five alarms on the LED. If the compressor is locked out, 
remove any call for cooling at the thermostat or by 
disconnection the thermostat wiring at the Y4 UCB 
terminal. This will reset any installation, compressor lock 
outs

NOTE  : While the above steps will reset any lockouts, 
compressor # 1, 2 & 3 will be held off for the ASCD, and the 
compressor # 4 may be held off for a portion of the ASCD, 
see the next step

9.  If 24 volts is present at the UCB Y4 terminal and none of 

the switches are open and the compressor is not locked 
out, the UCB may have the compressor in an ASCD. 
Check the LED for an indication of an ASCD cycle. The 
ASCD should time out within 5 minutes. Press and 
release the TEST button to reset all ASCDs.

10.  The UCB Can be programmed to lock out compressor 

operation during free cooling and in low ambient 

conditions. These options are not enabled by default. 
Local distributors can test the UCB for this programming.

11.  If none of the above corrected the error, test the integrity 

of the UCB, disconnect the C4 terminal wire and the 
jumper it to the Y4 terminal, DO NOT jump the Y4 to C4 
terminals. If the compressor engages, the UCB has 
faulted.

12.  If none of the above correct the error, replace the UCB.

On a call for cooling, the supply air blower motor and 
compressor #  2 are operating but compressor # 1 is not (the 
room thermostat fan switch is in the “AUTO” position).

1.  Compressor # 2 is energized in place of compressor # 1 

when compressor # 1 is unavailable for cooling calls. 
Check the UCB for alarms indicating that compressor # 
1 is locked out. Press and release the ALARMS button if 
the LED is not flashing an alarm.

2.  Check for line voltage at the compressor contactor 1, 

and that the contactor is pulled in. Check for loose wiring 
between the contactor and the compressor.

3.  If compressor contactor 1 is pulled in and voltage is 

supplied at the contactor 1, lightly touch the compressor 
housing. If it is hot, the compressor may be off on 
inherent protection. Cancel any calls for cooling and wait 
for the internal overload to reset. Test again when cool.

4.  If compressor contactor 1 is not pulled in, check for 24 

volts at the coil. If 24 volts is present and compressor 
contactor 1 is not pulled in, replace the contactor.

5.  Failing the above, if voltage is supplied at compressor 

contactor 1, and it is pulled in, and the compressor still 
does not operate, replace the compressor.

6.  If 24 volts is not present at compressor contactor, check 

for 24 volts at the UCB terminal, C1. If 24 volts is 
present, check for loose wiring between C1 and the 
compressor contactor 1.

7.  If 24 volts is not present at the C1 terminal, check for 24 

volts from the room thermostat at the UCB Y1 terminal. 
If 24 volts are not present at the UCB Y1 terminal, the 
UCB may have faulted. Check for 24 volts at the Y1 
ECON terminal. If 24 volts is not present at Y1 “ECON”, 
the UCB has faulted. The UCB should de-energize all 
compressors on a loss of call for the first stage of 
cooling, i.e. a loss if 24 volts at the Y1 terminal.

8.  If 24 volts are present at the UCB Y1 terminal, the 

compressor may be out due to an open high pressure 
switch, low pressure switch, or freezestat. Check for 24 
volts at the HPS1, LPS1, and FS1 terminals of the UCB. 
If a switch has opened, threshold be a voltage potential 
between the UCB terminals, e.g. if LPS1 has opened, 
there will be a 24 volt potential between the LPS1 
terminals.

9.  If 24 volts is present at the UCB Y1 terminal and none of 

the protection switches have opened, the UCB may have 

Summary of Contents for DMS 360 Series

Page 1: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 27 NOTES ...

Page 2: ...Installation Operation Maintenance Manual IOM 036 1011 0806 60 Hz ...

Page 3: ...imit switch 19 Freezestat 19 Low ambient cooling 19 Safety controls 19 Compressor protection 19 Flash codes 20 Reset 20 Electric heating sequence of operations 20 Heating operation errors 20 START UP Restart check list 20 Operating instructions 20 Post start check list 20 Shut down 21 Belt drive blower 21 TROUBLE SHOOTING Cooling trouble shooting guide 21 Unit flash codes 25 MAINTENANCE Every mont...

Page 4: ...hing cloth and have a fire extinguisher available for all brazing operations INSPECTION As soon as a unit is received it should be inspected for possible damage during transit If damage is evident the extent of the damage should be noted on the carrier s freight bill RENEWAL PARTS Refer to York USER S MAINTENANCE and SERVICE INFORMATION MANUAL It is strongly suggested that only genuine YORK Spare ...

Page 5: ...available to the consumer and with instructions to retain them for future reference LIMITATIONS These units must be installed in accordance with the applicable national and local safety codes Refer to Unit Application Data table If components are to be added to a unit to meet local codes they are to be installed at the dealer s and or the customer s expense Size of unit for proposed installation s...

Page 6: ...provisions for adequate ventilation air in accordance with applicable provisions of the local building codes Refer to Dimensions and Clearances Refer Figure 8 for the clearances required for servicing and proper unit operation DUCTWORK A closed return duct system should be used This should not preclude use of outdoor fresh air intake The supply and return air duct connections at the unit should be...

Page 7: ...e threads Install a condensate drain line from the one inch FPT female connection on the unit to an open drain NOTE The condensate drain operates in a negative pressure in the cabinet The condensate drain line MUST be trapped to provide proper drainage See Figure 4 FIGURE 4 RECOMMENDED DRAIN PIPING FIGURE 5 LOADING POINTS FIGURE 3 FIXED OUTDOOR AIR DAMPER ...

Page 8: ...tings and ready for operation the tabulated rating with a short circuit capacity of 10K or more for the unit The switch must be separate from all other circuits Wire entry at knockout openings require conduit fittings to comply with local codes Refer to the Dimensions and Clearances Figure 7 for installation location If any of the wire supplied with the unit must be replaced replacement wire must ...

Page 9: ... units are properly phased at the factory Check for proper compressor rotation If the blower or compressors rotate in the wrong direction at start up the electrical connection to the unit is mis phased Change the incoming line connection phasing to obtain proper rotation Scroll compressors operate in only one direction If the scroll is drawing low amperage has similar suction and discharge pressur...

Page 10: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 9 PRODUCT DATA TABLE 4 PRODUCT DATA ...

Page 11: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 10 DIMENSIONS AND CLEARANCES FIGURE 7 DIMENSIONAL DATA AND CLEARANCES ...

Page 12: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 11 DRIVE AND PULLEY DATA TABLE 5 DRIVE AND PULLEY DATA ELECTRICAL DATA TABLE 6 ELECTRICAL DATA ...

Page 13: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 12 ELECTRICAL DATA TABLE 6 ELECTRICAL DATA ...

Page 14: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 13 TABLE 7 FAN PERFORMANCE DATA ...

Page 15: ...anual 036 1011 0806 Page 14 ADDITIONAL PRESSURE DROPS FIGURE 8 PRESSURE DROPS DUE TO OPTIONS The additional pressure losses should be calculated from the graph and ADDED along with the ESP External Static Pressure to calculate fan performance ...

Page 16: ...ta Table 5 WARNING FAILURE TO PROPERLY ADJUST THE TOTAL SYSTEM AIR QUANTITY CAN RESULT IN EXTENSIVE BLOWER DAMAGE SAFETY This section of the IOM covers Safety Aspects applicable to the York DMS Saber Roof Top Air Conditioners Adherence to the instructions detailed hereunder will ensure the safety of the operators prevent damage to the equipment and prevent accidents FIGURE 10 UNIT NAMEPLATE TERMIN...

Page 17: ...gs and signs regarding the units must be absolutely observed STAFF TRAINING The unit should be started up and serviced routine and corrective maintenance by authorized and trained staff only This staff must be informed about possible hazards regarding Electrical connections Piping connections Duct connections Start up These operations must be executed only by trained persons who on behalf of the u...

Page 18: ... Page 17 personnel of the commonly recognized dangers associated with this equipment In addition to following the manufacturer s installation instructions care must be taken to ensure compliance with federal state and local rules regulations codes and standards ...

Page 19: ... completion of a call for cooling Heating always takes priority COOLING SEQUENCE OF OPERATION CONTINUOUS BLOWER By setting the room thermostat fan switch to ON the supply air blower will operate continuously INTERMITTENT BLOWER With the room thermostat fan switch set to AUTO and the system switch set to either the AUTO or HEAT settings the blower is energized whenever a cooling or heating operatio...

Page 20: ...ctive the condenser fans will be de energized FREEZESTAT During cooling operation if a freezestat opens the UCB will de energize the associated compressor initiate the ASCD and if the other compressor is idle stop the condenser fans If the call for cooling is still present at the conclusion of the ASCD the UCB will reenergize the halted compressor Should a freezestat open three times within two ho...

Page 21: ...le 11 SAFETY CONTROLS The unit control board monitors the temperature limit switch of electric heat units The control circuit includes the following safety controls Temperature Limit Switch AUTO This control is located inside the heater compartment and is set to open at 120 F It resets automatically The limit switch operates when a high temperature condition caused by inadequate supply air flow oc...

Page 22: ...l any thermostat calls and set the fan switch to AUTO Wait for the internal overload to reset Test again when cool 5 If blower contactor is not pulled in check for 24 volts at the contactor coil If 24 volts are present but it is not pulled in replace the contactor 6 Failing the above if there is line voltage supplied at contactor and it is pulled in and the supply air blower motor still does not o...

Page 23: ...room thermostat fan switch is in the AUTO position 1 Compressor 2 will not energize simultaneously with compressor 1 if a call for both stages of cooling is received The UCB delays compressor 2 by 30 seconds to prevent a power surge If after the delay compressor 2 does not energize on a second stage call for cooling check for line voltage at the compressor contactor 2 and that the contactor is pul...

Page 24: ...oom thermostat and the UCB Loose wiring from the room thermostat to the UCB 7 If 24 volts is present at the UCB Y3 terminal the compressor may be out due to an open high pressure switch low pressure switch or freezestat Check for 24 volts at the HPS3 LPS3 and FS3 terminals of the UCB If a switch has opened there should be a voltage potential between the UCB terminals e g if LPS3 has opened there w...

Page 25: ...g and in low ambient conditions These options are not enabled by default Local distributors can test the UCB for this programming 11 If none of the above corrected the error test the integrity of the UCB disconnect the C4 terminal wire and the jumper it to the Y4 terminal DO NOT jump the Y4 to C4 terminals If the compressor engages the UCB has faulted 12 If none of the above correct the error repl...

Page 26: ...minal wire and jumper it to the Y1 terminal DO NOT jump the Y1 to C1 terminals If the compressor engages has faulted 13 If none of the above correct the error replace the UCB TABLE 11 UNIT FLASH CODES UNIT FLASH CODES Various flash codes are utilized by the unit control board UCB to aid in troubleshooting Flash codes are distinguished by the short on and off cycle used approximately 200 ms on and ...

Page 27: ... 10 mm to 13 mm when pressed lightly with a finger Every Six Months In addition to the maintenance done every three months The condenser coils should be cleaned by spraying water over it at low pressure or with a brush while ensuring that the fins are not damaged Check all electrical connections and tighten them if required Clean all accessible electrical panels of dirt and dust Before cleaning th...

Page 28: ... has a wide range of product choices for residential and light commercial applications Our offering includes package split air conditioners and heat pumps In addition York offers chillers air handling units ventilation equipment and controls for larger projects Our Cutting Edge Technology is leading the way in developing efficient and environment friendly solutions for your homes offices and place...

Reviews: