Installation, Operation and Maintenance Manual : 036-1011(0806)

Page 20

protector will open to shut down the compressor. The UCB 
incorporates features to minimize compressor wear and 
damage.

An anti short cycle delay (ASCD) is utilized to prevent 
operation of a compressor too soon after its previous run. 
Additionally, a minimum run time is imposed any time a 
compressor is energized.

The ASCD is initiated on unit start up and on any compressor 
reset or lock out.

FLASH CODES 

The UCB will initiate a flash code associated with errors 
within the system. Refer to UNIT CONTROL BOARD FLASH 
CODES Table 11.

RESET

 

Remove the call for cooling, by raising thermostat setting 
higher than the conditioned space temperature. This resets 
any pressure or freezestat flash codes.

ELECTRIC HEATING SEQUENCE OF OPERATIONS

 

The following sequence describes the operation of the 
electric heat section. Two-stage heating (Heaters MUST use 
a two stage thermostat) :

a.  Upon a call for first-stage heat by the thermostat, the 

heater contactor will be energized. After completing the 
specified fan on delay for heating, the UCB will energize 
the blower motor. If the second stage of heat is required, 
second heater contactor will be energized. After 
completing the specified fan on delay for heating, the 
UCB will energize the blower motor.

b.  The thermostat will cycle the electric heat to satisfy the 

heating requirements of the conditioned space.

HEATING OPERATION ERRORS 

TEMPERATURE LIMIT

 

If the UCB senses zero volts from the high temperature limit, 
the indoor blower motor is immediately energized. This limit 
is monitored regardless of unit operation status, i.e. the limit 
is monitored at all times. If the temperature limit opens three 
times within one hour, it will lock on the indoor blower motor 
and a flash code is initiated (See Table 11).

SAFETY CONTROLS

 

The unit control board monitors the temperature limit switch 
of electric heat units. The control circuit includes the following 
safety controls :

Temperature Limit Switch (AUTO)

This control is located inside the heater compartment and is 
set to open at 120°F. It resets automatically. The limit switch 
operates when a high temperature condition, caused by 

inadequate supply air flow occurs, thus shutting down the 
heater and energizing the blower.

RESET 

Remove the call for cooling, by raising thermostat setting 
higher than the conditioned space temperature. This resets 
any pressure or freezestat flash codes.

FLASH CODES

 

The UCB will initiate a flash code associated with errors 
within the system. Refer to UNIT CONTROL BOARD FLASH 
CODES Table 11.

START UP (COOLING) 

PRESTART CHECK LIST

 

After installation has been completed :

1.  Check the electrical supply voltage being supplied. Be 

sure that it is the same as listed on the unit nameplate.

2.  Set the room thermostat to the on position.

3.  Turn unit electrical power on.

4.  Set the room thermostat fan switch to on.

5.  Check indoor blower rotation.
 

If blower rotation is in the wrong direction. Refer to 
Phasing Section in general information section.

 

Check blower drive belt tension.

 

Check bearing lubrication. If it requires lubrication, 
grease it.

6.  Check the unit supply air (CFM).

7.  Measure evaporator fan motor amp draw.

8.  Set the room thermostat fan switch to off.

9.  Turn unit electrical power off.

OPERATING INSTRUCTIONS 

1.  Turn unit electrical power on.

2.  Set the room thermostat setting to lower than the room 

temperature.

3.  First stage compressors will energize after the built in 

time delay (five minutes).

4. The 

2

nd

, 3

rd

 and 4

th

 stage of the thermostat will energize 

the respective compressors (if needed).

POST START CHECK LIST

 

1.  Verify proper system pressures for both circuits.

2.  Measure the temperature drop across the evaporator 

coil.

3.   Measure the system Amperage draw across all legs of 3 

phase power wires.

4.   Measure the condenser fan amp draw.

Summary of Contents for DMS 360 Series

Page 1: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 27 NOTES ...

Page 2: ...Installation Operation Maintenance Manual IOM 036 1011 0806 60 Hz ...

Page 3: ...imit switch 19 Freezestat 19 Low ambient cooling 19 Safety controls 19 Compressor protection 19 Flash codes 20 Reset 20 Electric heating sequence of operations 20 Heating operation errors 20 START UP Restart check list 20 Operating instructions 20 Post start check list 20 Shut down 21 Belt drive blower 21 TROUBLE SHOOTING Cooling trouble shooting guide 21 Unit flash codes 25 MAINTENANCE Every mont...

Page 4: ...hing cloth and have a fire extinguisher available for all brazing operations INSPECTION As soon as a unit is received it should be inspected for possible damage during transit If damage is evident the extent of the damage should be noted on the carrier s freight bill RENEWAL PARTS Refer to York USER S MAINTENANCE and SERVICE INFORMATION MANUAL It is strongly suggested that only genuine YORK Spare ...

Page 5: ...available to the consumer and with instructions to retain them for future reference LIMITATIONS These units must be installed in accordance with the applicable national and local safety codes Refer to Unit Application Data table If components are to be added to a unit to meet local codes they are to be installed at the dealer s and or the customer s expense Size of unit for proposed installation s...

Page 6: ...provisions for adequate ventilation air in accordance with applicable provisions of the local building codes Refer to Dimensions and Clearances Refer Figure 8 for the clearances required for servicing and proper unit operation DUCTWORK A closed return duct system should be used This should not preclude use of outdoor fresh air intake The supply and return air duct connections at the unit should be...

Page 7: ...e threads Install a condensate drain line from the one inch FPT female connection on the unit to an open drain NOTE The condensate drain operates in a negative pressure in the cabinet The condensate drain line MUST be trapped to provide proper drainage See Figure 4 FIGURE 4 RECOMMENDED DRAIN PIPING FIGURE 5 LOADING POINTS FIGURE 3 FIXED OUTDOOR AIR DAMPER ...

Page 8: ...tings and ready for operation the tabulated rating with a short circuit capacity of 10K or more for the unit The switch must be separate from all other circuits Wire entry at knockout openings require conduit fittings to comply with local codes Refer to the Dimensions and Clearances Figure 7 for installation location If any of the wire supplied with the unit must be replaced replacement wire must ...

Page 9: ... units are properly phased at the factory Check for proper compressor rotation If the blower or compressors rotate in the wrong direction at start up the electrical connection to the unit is mis phased Change the incoming line connection phasing to obtain proper rotation Scroll compressors operate in only one direction If the scroll is drawing low amperage has similar suction and discharge pressur...

Page 10: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 9 PRODUCT DATA TABLE 4 PRODUCT DATA ...

Page 11: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 10 DIMENSIONS AND CLEARANCES FIGURE 7 DIMENSIONAL DATA AND CLEARANCES ...

Page 12: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 11 DRIVE AND PULLEY DATA TABLE 5 DRIVE AND PULLEY DATA ELECTRICAL DATA TABLE 6 ELECTRICAL DATA ...

Page 13: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 12 ELECTRICAL DATA TABLE 6 ELECTRICAL DATA ...

Page 14: ...Installation Operation and Maintenance Manual 036 1011 0806 Page 13 TABLE 7 FAN PERFORMANCE DATA ...

Page 15: ...anual 036 1011 0806 Page 14 ADDITIONAL PRESSURE DROPS FIGURE 8 PRESSURE DROPS DUE TO OPTIONS The additional pressure losses should be calculated from the graph and ADDED along with the ESP External Static Pressure to calculate fan performance ...

Page 16: ...ta Table 5 WARNING FAILURE TO PROPERLY ADJUST THE TOTAL SYSTEM AIR QUANTITY CAN RESULT IN EXTENSIVE BLOWER DAMAGE SAFETY This section of the IOM covers Safety Aspects applicable to the York DMS Saber Roof Top Air Conditioners Adherence to the instructions detailed hereunder will ensure the safety of the operators prevent damage to the equipment and prevent accidents FIGURE 10 UNIT NAMEPLATE TERMIN...

Page 17: ...gs and signs regarding the units must be absolutely observed STAFF TRAINING The unit should be started up and serviced routine and corrective maintenance by authorized and trained staff only This staff must be informed about possible hazards regarding Electrical connections Piping connections Duct connections Start up These operations must be executed only by trained persons who on behalf of the u...

Page 18: ... Page 17 personnel of the commonly recognized dangers associated with this equipment In addition to following the manufacturer s installation instructions care must be taken to ensure compliance with federal state and local rules regulations codes and standards ...

Page 19: ... completion of a call for cooling Heating always takes priority COOLING SEQUENCE OF OPERATION CONTINUOUS BLOWER By setting the room thermostat fan switch to ON the supply air blower will operate continuously INTERMITTENT BLOWER With the room thermostat fan switch set to AUTO and the system switch set to either the AUTO or HEAT settings the blower is energized whenever a cooling or heating operatio...

Page 20: ...ctive the condenser fans will be de energized FREEZESTAT During cooling operation if a freezestat opens the UCB will de energize the associated compressor initiate the ASCD and if the other compressor is idle stop the condenser fans If the call for cooling is still present at the conclusion of the ASCD the UCB will reenergize the halted compressor Should a freezestat open three times within two ho...

Page 21: ...le 11 SAFETY CONTROLS The unit control board monitors the temperature limit switch of electric heat units The control circuit includes the following safety controls Temperature Limit Switch AUTO This control is located inside the heater compartment and is set to open at 120 F It resets automatically The limit switch operates when a high temperature condition caused by inadequate supply air flow oc...

Page 22: ...l any thermostat calls and set the fan switch to AUTO Wait for the internal overload to reset Test again when cool 5 If blower contactor is not pulled in check for 24 volts at the contactor coil If 24 volts are present but it is not pulled in replace the contactor 6 Failing the above if there is line voltage supplied at contactor and it is pulled in and the supply air blower motor still does not o...

Page 23: ...room thermostat fan switch is in the AUTO position 1 Compressor 2 will not energize simultaneously with compressor 1 if a call for both stages of cooling is received The UCB delays compressor 2 by 30 seconds to prevent a power surge If after the delay compressor 2 does not energize on a second stage call for cooling check for line voltage at the compressor contactor 2 and that the contactor is pul...

Page 24: ...oom thermostat and the UCB Loose wiring from the room thermostat to the UCB 7 If 24 volts is present at the UCB Y3 terminal the compressor may be out due to an open high pressure switch low pressure switch or freezestat Check for 24 volts at the HPS3 LPS3 and FS3 terminals of the UCB If a switch has opened there should be a voltage potential between the UCB terminals e g if LPS3 has opened there w...

Page 25: ...g and in low ambient conditions These options are not enabled by default Local distributors can test the UCB for this programming 11 If none of the above corrected the error test the integrity of the UCB disconnect the C4 terminal wire and the jumper it to the Y4 terminal DO NOT jump the Y4 to C4 terminals If the compressor engages the UCB has faulted 12 If none of the above correct the error repl...

Page 26: ...minal wire and jumper it to the Y1 terminal DO NOT jump the Y1 to C1 terminals If the compressor engages has faulted 13 If none of the above correct the error replace the UCB TABLE 11 UNIT FLASH CODES UNIT FLASH CODES Various flash codes are utilized by the unit control board UCB to aid in troubleshooting Flash codes are distinguished by the short on and off cycle used approximately 200 ms on and ...

Page 27: ... 10 mm to 13 mm when pressed lightly with a finger Every Six Months In addition to the maintenance done every three months The condenser coils should be cleaned by spraying water over it at low pressure or with a brush while ensuring that the fins are not damaged Check all electrical connections and tighten them if required Clean all accessible electrical panels of dirt and dust Before cleaning th...

Page 28: ... has a wide range of product choices for residential and light commercial applications Our offering includes package split air conditioners and heat pumps In addition York offers chillers air handling units ventilation equipment and controls for larger projects Our Cutting Edge Technology is leading the way in developing efficient and environment friendly solutions for your homes offices and place...

Reviews: