This Commissioning Checklist is to be completed in full by the competent person who commissioned the wsnn air unit and associated
equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference
Failure to Install and commission this equipment to the manufacturer's instructions may Invalidate the warranty but does not affect statutory rights.
CONDENSING WARM AIR HEATING AND WATER HEATING COMMISSIONING CHECKLIST
Customer name:
Telephone number:
Address:
Warm Air Unit Make and Model:
Warm Air Unit Serial Number:
Commissioned by (PRINT NAME):
Gas safe register number:
Company name:
Telephone number:
Company address:
Commissioning date:
CONTROLS
(tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and programmer/timer
Programmable Roomstat
Load/weather compensation
Optimum start control
Heating zone control
Fitted
Not required
WARM AIR HEATER
Has the system been balanced in accordance with the heater manufacture's instructions?
Yes
No
Was an anemometer used?
Yes
No
Yes
No
WARM AIR HEATING:
measure and record:
Bumer operating pressure (at maximum rate)
mbar
Heat input
kW
Temperature difference between return air inlet and nearest outlet
°C
WATER HEATING:
(If fitted)
Water inlet temperature
Water outlet temperature
°C
°C
CONDENSATE
The condensate drain has been installed in accordance with the manufacture's instructions and/or BS 5546/BS6798
Yes
INSTALLATION
The heating and hot water system complies with the appropriate Building Regulations
Yes
The system and associated products have been installed and commissioned in accordance with the manufacturers instructions
Yes
Yes
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer’s Signature
Customer’s Signature
*
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
www.centralheating.co.uk