www.johnsonandstarley.co.uk
2
In the interest of continuous development Johnson and Starley reserve the right to change specification without prior notice.
Johnson and Starley prides itself on it’s ability to supply spare parts quickly and efficiently.
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE
STARTING INSTALLATION. LEAVE THESE INSTRUCTION WITH
THE USER OR AT THE GAS METER AFTER INSTALLATION
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are
provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with
the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of
Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
CONTENTS
The Benchmark Scheme
2
1 Features
3
2 General Description
3
3 Building Standards & Regulations
4
4 Safety &Gas Information
4
General Safety Information
Gas Categories
Gas Supply
5 Technical Data
5
6 Heater Compartment Clearances
5
7 Ventilation Air
6
8 Duct System
6
Return Air
Warm Air Delivered
9 Flue Instructions
7
Flue Installation
Flue Terminal Positions
Terminal Dimensions
Horizontal Terminal Location
Vertical Terminal Location
Plume Terminal Positions
Conventional 80/125mm Flue Accessories
10 Electrical
11
Mains Supply
Thermista-stat & It’s Location
11 Gas
11
12 Fitting Instructions
11
13 Air Heater Commissioning
13
Preparation
System Balancing
Lighting Ignition & Main Burner
Main Burner Pressure Test
Automatic Controls Check
Safety Check
14 Intejan Circulator
14
Water Circulator System
Water Connections
15 Intejan Circulator Commissioning
15
Preparation
Lighting Ignition & Main Burner
Water Burner Pressure Test
Safey Check
16 Users Instructions
16
17 Servicing & Maintenance
17
Routine Maintenance
Multi Functional Control & Air Heater
Water Circulator Burner Assembly Removal
Burner Assembly Removal
Ignition Burner & Electrode Removal & Replacement
Air Circulation Fan Removal & Cleaning
Control Module Removal
Time Control, Switch & LED Indicator Removal
Fan Delay Control/Limit Switch Removal
Water Circulator Thermostat Removal
Heat Exchanger Access
Flue Fan removal & Cleaning
18 Defect Diagnosis
20
19 Fault Finding Flowcharts
21
20 Logic Diagram
24
21 Schematic Diagram
25
22 Circuit Diagram
26
23 Dimensions
27
24 Short List of Spares
28
25 Exploded Diagram
29
26 Benchmark Checklist and Service Record
30