
SECTION 4 - BOOM & PLATFORM
3121774
4-13
4.
Position SkyGuard switch assembly with sensor
cover onto the SkyGuard Support Bracket
(8)
as
shown in Figure 4-21.
5.
Insert a Shear Block Support
(10)
through shear
block housing on the SkyGuard support bracket
and into the platform sensor mount.
NOTE:
Ensure the correct position of Shear Block Support
(10) before installation.
6.
Secure the shear block on welded mount of Sky-
Guard support bracket using Bolt
(1)
, relevant
Washer
(6)
and Acorn Nut
(4)
as shown in
7.
Secure the SkyGuard switch assembly using Bolt
(5)
and relevant Washer
(6)
on platform sensor
mount. See Figure 4-21.
NOTE:
Tighten the Bolt
(5)
using appropriate allen wrench.
8.
Repeat Steps 4 through 7 to secure SkyGuard
switch assembly on the other side of the Sky-
Guard support bracket ensuring correct position
of the shear block support before installation.
Figure 4-21.
9.
Route the SkyGuard switch harness along Sky-
Guard support bracket (right side) and under the
platform control box. Secure the harness using
tie straps. See Figure 4-22.
Figure 4-22.
10.
Connect SkyGuard connector to the one on the
machine located under load cell box. See
Figure 4-23.
SkyGuard Switch
Assembly
Tie Strap
Skyguard Switch
Harness
4 Pin Female
Connector
Go
to
Discount-Equipment.com
to
order
your
parts