SECTION 4 – MACHINE OPERATION
31210162
– JLG Lift –
4-15
1.
Connect the
AC input plug (1)
to a grounded outlet.
2.
When first powered up, the charger will go through a
short LED indicator self-test. The battery charger light’s
on the Ground Control Station will flash in sequence for
two seconds.
3.
The batteries are fully charged when the green light on
the battery charger status panel (Ground Control Sta-
tion) is illuminated.
NOTE:
If the charger is left plugged in, the charger will automati-
cally restart a complete charge cycle if the batteries volt-
age drops below a minimum voltage or 30 days has
elapsed.
Summary of Contents for Toucan 12E
Page 2: ......
Page 12: ...TABLE OF CONTENTS vi JLG Lift 31210162 NOTES...
Page 22: ...SECTION 1 SAFETY PRECAUTIONS 1 10 JLG Lift 31210162 NOTES...
Page 54: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 20 JLG Lift 31210162 NOTES...
Page 58: ...SECTION 4 MACHINE OPERATION 4 4 JLG Lift 31210162 Figure 4 3 Grade and Side Slope...
Page 74: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 31210162 NOTES...
Page 135: ......