COMMISSIONING CHECKLIST
SERIAL NO :
F:\Docs\Forms\Checklists\COF.CL224924 COMMISSIONING Star-Derwent.doc
221300 -
2
2
4
9
2
4
PLEASE LEAVE THIS DOCUMENT WITH CUSTOMER AFTER COMPLETION
INSTALLER
PLEASE TICK
8.
Once heater has reached the high setting, check the pressure (referring to
page 3 of the manual for pressure settings) and adjust if necessary. NOTE:
the acceptable range for high on LPG is between 1.35
– 1.55kPa and the
acceptable range for high on Natural Gas is between 0.55
– 0.65kPa
9.
Re-check the low pressure setting by disconnecting one of the orange wires
attached to the front of the blue solenoid. Adjust if necessary referring to page
3 of the manual or the compliance decal (on back of false panel) for correct
pressure setting. Reconnect orange wire (flame will jump back to high setting).
Replace clear plastic cap over adjustment screws.
10.
Check reliable & positive ignition of heater by turning unit Off & On (allowing
heater to go to high each time) several times. To Check thermostat feature,
have the heater going then reduce the set temperature to below the room
temperature (heater will turn off), then increase the set temperature above the
room temperature (heater will go through start sequence) and check for
positive & reliable ignition. Leave heater running while replacing the facia &
false panel and packing up tools. Finally, leave this completed form with
customer
after
showing them the correct operation of heater.
Signed
Tradesman’s Ph/No.
Date.
Comments:
/ /