13
6.2 Unpacking
Remove any remnants of shipping crate and check
for shipping damage. Report any damage
immediately to your distributor and shipping agent.
Do not discard any shipping material until the
Radial Arm Drill Press is installed and running
properly.
Compare the contents of your container with the
following parts list to make sure all parts are intact.
Missing parts, if any, should be reported to your
distributor. Read the instruction manual thoroughly
for assembly, maintenance and safety instructions.
Contents of Shipping Container
(see Figure 8)
1 Radial Arm Drill Press (not shown)
6 Leveling
Pads
1 Tool Box, containing:
1 Grease
gun
1 Oil
bottle
1 Tapered
drift
1 Adjustable
wrench
1 Set of hex keys
1 Flat blade screwdriver
1 Cross point screwdriver
1 Instructions and Parts Manual (not shown)
1 Warranty Card (not shown)
1 Manufacturer’s Test Chart (not shown)
Figure 8: Tools provided
Read and understand the entire contents of this manual before attempting set-up or
operation! Failure to comply may cause serious injury.
Summary of Contents for J-1600R
Page 11: ...11 General Features and Terminology J 1600R cont Figure 4 Figure 5 ...
Page 16: ...16 7 0 Operating Controls Figure 10 Operating Controls ...
Page 27: ...27 Figure 20 Figure 21 Figure 22 ...
Page 30: ...30 13 2 1 Column and Base Exploded View ...
Page 34: ...34 13 4 1 Gearbox Assembly Upper Section Exploded View ...
Page 37: ...37 13 5 1 Gearbox Assembly Lower Section Exploded View ...
Page 42: ...42 13 6 1 Rear of Head Exploded View ...
Page 47: ...47 13 8 1 Hydraulic Clamping Mechanism Exploded View ...
Page 50: ...50 13 9 1 Hydraulic System Exploded View ...
Page 52: ...52 14 0 Electrical Connections for J 1600R ...