Check Box When This Step is Complete
Step # 7-E
Checking the selector switch on remaining power supplies
Check to make sure that each power supply selector switch is set to
the proper line voltage for your facility.
Check Box When This Step is Complete
Step # 7-F
Unplug the power cord going to the computer
Unplug the AC power cord going to the computer. To prevent
possible errors in monitor setup, ensure that the computers AC
power cable is removed.
Check Box When This Step is Complete
INSTALLATION INSTRUCTIONS
Step # 7-D
Switching to LIFT mode.
Turn the RED selector switch to "RAISE UP/DOWN"
Jennison Entertainment Technologies
Snow Down Service Manual
Page 31