ATTENTION!!!
The
Steam
Generator,
steam installation, condensate installation
and the process in which the steam will be
used may contain various wastes from
production;
since
they
are
newly
manufactured. When the steam generator
is put into operation for the first time,
sending these wastes out of the system
will prevent malfunction of the machine.
Opening by-pass valves in the process
and, if possible, giving the condensate
return to the external environment for a
period of half to one hour will ensure that
these
steam-drained
wastes
are
discharged. If the condensate return
cannot be given out, it will be beneficial to
turn
the
blowdown
valve
of
the
condensate tank to the fully open position
and ensure that it is also blown again for
the same amount of time.
22
i
–
Jenesis Vapor Generator Sections
✓
Generator main body
✓
Combustion chamber
✓
Front cover refractory
✓
Front cover insulation
✓
Coil (serpentine)
✓
Front mirror
✓
Back mirror
✓
Smoke cover
✓
Body Isolation
✓
Smokestack
✓
Sight glass
✓
Rear smoke chest
Summary of Contents for SHS Series
Page 10: ...Steam Distribution Connection Diagram 10 Buhar Da l m Kollekt r...
Page 12: ...Condensate Return Connection Diagram 12...
Page 15: ...15 Vent Connection and Blowdown Connection Diagram...
Page 55: ...55...
Page 56: ...56...