e
–
Operating Conditions
✓
Type SHS Vapor Generators are designed to
generate vapor
.
✓
Water should be supplied with appropriate hardness through the feed water inlet.
✓
The feed water inlet hardness value used should be
0
˚Fr
.
✓
Daily, weekly and monthly controls and maintenance should be carried out according to the
instructions for use.
20
f
–
Fuel Types to Be Used
✓
SHS type Steam Generators are designed according to the usage of Diesel, Biodiesel, Fuel-Oil
fuel types in liquid fuels and Natural Gas (LNG, CNG) and LPG fuel options in gas fuels. Do not,
under any circumstances, change the settings of the fuel units of your device other than these
types of fuel.
g - Commissioning -
Controls to be done before commissioning
✓
Perform the hardness analysis of the water to be used, it should be 00 (zero) F.
✓
Check the fuel line for fuel.
✓
Check the condensate tank for water.
✓
Check the supply system for closed valves. (Fuel supply valve, condensate tank filling
installation, pump supply installation)
✓
Check the feed pump connections (oil, water) for leaks.
✓
Check that the oil level is within the proper range and that water is not mixed into the oil from
the oil pump dipstick.
✓
Change the pump oil every 3 months. Type of oil to be used (SAE 90 GL 4).
Summary of Contents for SHS Series
Page 10: ...Steam Distribution Connection Diagram 10 Buhar Da l m Kollekt r...
Page 12: ...Condensate Return Connection Diagram 12...
Page 15: ...15 Vent Connection and Blowdown Connection Diagram...
Page 55: ...55...
Page 56: ...56...