Step 12
:
Connect the electrical system.
Attention: electrical connection must be done by a licensed electrician.
Connect the wiring as per the wiring diagram and do pay careful attention to the number tubes attached on each thread of wire.
Wires of with the same number shall be connected.
Step 13: Mounting of top and bottom stop
When top and bottom stops are mounted in the main post, it is important that they are mounted correctly as otherwise they can
break when the lift is tested. See picture below how to place them in the main post. Also remember to adjust the arm on the top
and bottom stops.
Bottom stop
Top stop
Step 14: Leveling
No vehicle on platforms when leveling.
Switch on and press the UP button when the green power indicating light is on. When the steel cable has been tightened,
measure if the two platforms are of the same height from the ground. If not, adjust the tightening screw fixed on top of the main
post.
Step14: Fix the expansion plug.
Summary of Contents for JA5500F
Page 19: ...19 Annex2 Overall diagram...
Page 20: ...20 Annex3 Floor plan Annex 4 Steel cable connection...
Page 22: ...22 Annex 6 Wiring diagram Three phase...
Page 23: ...23 Electric wire connections in control box Picture of the control box and connections...
Page 24: ...24...
Page 25: ...25...
Page 26: ...26...
Page 27: ...27 Annex7 Separate diagrams for the lift JA5500F...
Page 35: ...35 Annex9 Size and weight requirements on vehicles...
Page 36: ...36...