- 106 -
15.4 LAUNCH/LIFT OUT
The initial commissioning of your boat will require a lot of skill and care. The proper working of
all your boat's equipment is the result of the quality of the commissioning operations. This is
why the initial launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Check the anodes (see the chapter on Electricity).
- Check the propeller (see the chapter on Steering).
- Prepare enough fenders and lines.
- Check the opening of the fuel supply tap (see the chapter on motorisation).
-
Towing ring
(used only for towing purposes)
Do not remain onboard or beneath the boat during the handling operations.
- When placing the slings make sure that the positioning marks are still
visible.
- Submerge the sling fully under the engine mounting.
Summary of Contents for MERRY FISHER 695 MARLIN
Page 1: ...MERRY FISHER 695 MARLIN OWNER S MANUAL 981522 Index C...
Page 2: ......
Page 6: ......
Page 10: ......
Page 18: ......
Page 24: ...24 Diagram of the layout Navigation lights...
Page 34: ...34 Diagram of the layout Drying out the bilge...
Page 36: ......
Page 48: ...48 Layout diagram DC circuit...
Page 50: ...50 7 2 5 Layout of the wiring looms in the hull DC circuit...
Page 60: ......
Page 62: ...62 10 3 FILLING CIRCUIT FRESH WATER DISTRIBUTION...
Page 76: ......
Page 88: ......
Page 102: ...102 14 4 SALOON TABLE...
Page 105: ...105 15 3 UPPER LIMIT OF ANTIFOUL Note Measurements are expressed in mm 15 HANDLING TRANSPORT...
Page 110: ......
Page 114: ...114...
Page 115: ...115 17 APPENDIXES...
Page 116: ......