33
Rigging Manual
5
STEPS (Continued):
• Use the electric hoist to raise the array. Be aware that the lower cluster may swing forward as it lifts off the ground.
• Insert the stop pins of the top three cabinets of the lower stack.
• Grab the lower cluster by the rear handlebar and gently pull back towards the rear of the array. While doing this, lower the array
until the front wheels touch the ground.
• Continue lowering the array until the rear attachment points draw close together and the link pin can be inserted.
• Lift the array off the ground, insert the stop pin between the fourth and fifth cabinets up from the ground, and remove the VT
or Case.
5
6
7
8
9
7
6
8
9