66
© JBG-HT (v.2.0)
INSTRUCTION MANUAL
– HEAT PUMP
HEATING SYSTEM
Heating circuit installation:
Installation in accordance with the manufacturer’s recommendations ☐ YES*
New installation ☐
Upgraded installation ☐
Heating type: floor heating ☐ / radiators ☐ / other ☐
Correctly connected supply and return pipes of central heating circuits ☐ YES*
Safety valve has been installed ☐ YES*
Outer pipes in UV- and high-temperature-resistant insulation ☐ YES*
Thickness of external pipe insulation according to the requirements (λ ≤ 0,035):
☐ YES*
•
inner diameter of the pipe less than 22 mm - insulation thickness of 20 mm;
•
inner diameter of the pipe from 22 to 35 mm - insulation thickness 30 mm;
•
inner pipe from 35 to 100 mm - insulation thickness equal to the inner diameter of the pipe;
•
inner pipe more than 100 mm - insulation thickness of 100 mm.
Dirt filter installed on the return of the heating system ☐ YES*
Installed magneto-demulsifier on the return of the heating system ☐ YES*
The minimum water charge necessary for proper operation and defrosting of the outdoor unit is provided ☐ YES*
The minimum required water flow through the system has been ensured ☐ YES*, it is ………. [l/min]
An expansion vessel was installed, the capacity of the vessel ….. L ☐ YES*
Additional vent valves ☐ YES ..…. units
Shut-off valves on the supply ☐ on the return ☐
Drain valves on the supply ☐* on the return ☐*
Number of heating circuits ☐ one ☐ two
Water in the central h DHW system
(according to the installer’s statement)
Heating water quality in accordance with the requirements of the instructions ☐ YES*
Heating system pressure ..... bar
Checked for leaks in the installation ☐ YES*
The installation was flushed prior to connecting the equipment ☐ YES*
Installation filled and vented ☐ YES*
DHW safety group installed ☐ YES*
Checking the correct operation of the water pump and the direction of flow ☐ YES*
* - mandatory fields - condition for starting up the device
Summary of Contents for ZHHS-01-10K-R290-V5-M
Page 2: ......