Section 21 Maintenance & Inspection
21-104
After completion of recovery, the following screen is displayed.
2
Turn off the power supply of this equipment by pressing the power button of the
operation unit.
21.11.4 Re-setting C-MAP
Re-set the settings of C-MAP by restarting this equipment.
Re-register the database and the license.
Update as required.
System
Recovery succeeded.
Turn the power off and on again.
C-MAP charts has been initialized.
Set up the setting of the C-MAP
charts.