Commissioning
Controller Home Screen
Following controller power-up and initialisation process (approximately 1 minute), the controller home screen will appear as
follows:
The low pressure and high pressure conditions of the unit are displayed. If
is switched OFF on the controller. To switch the unit ON, follow instructions on
conditions can be displayed by pressing the DOWN arrow:
up and initialisation process (approximately 1 minute), the controller home screen will appear as
The low pressure and high pressure conditions of the unit are displayed. If
OFF by Key
is indicated in the lower box, then the unit
is switched OFF on the controller. To switch the unit ON, follow instructions on page 22. Further information on the system
conditions can be displayed by pressing the DOWN arrow:
Page 20
up and initialisation process (approximately 1 minute), the controller home screen will appear as
is indicated in the lower box, then the unit
Further information on the system
Summary of Contents for JEHSD-0400-B3-M-3
Page 32: ...Issue 01 08 2020 Page 32 Electrical Wiring Diagram JEHSD 0400 B3 M 3 JEHSD 0600 B3 M 3 ...
Page 33: ...Issue 01 08 2020 Page 33 Electrical Wiring Diagram JEHSD 0800 B4 M 3 ...
Page 39: ...Issue 01 08 2020 Page 39 Technical Information Small Version Controller ...
Page 41: ...Issue 01 08 2020 Page 41 Certification ...
Page 42: ...Issue 01 08 2020 Page 42 Certification ...