7
Rough-in
WASHING
MACHINE
OUTLET
BOX
CONNECT #8 GAUGE (10mm2)
MINIMUM SOLID COPPER BOND
WIRE TO THE HOUSE
ELECTRICAL PANEL OR
APPROVED LOCAL GROUND.
AN APPROVED GROUND MAY
BE AN 8 FOOT LONG GROUND
ROD (3 METER LONG EARTH
ROD), A PLATE ELECTRODE, OR
OTHER ACCEPTABLE BOND.
CHECK YOUR LOCAL BUILDING
CODE FOR REQUIREMENTS.
(SEE PAGE
23
FOR BONDING
INSTRUCTIONS).
ELECTRICAL
OUTLET 240V
15A RATING TO
BE ON A GFCI
PROTECTED
CIRCUIT
HOSE
BIBB (2)
(2) 1/2 " HOT
& COLD
WATER
SUPPLY
LINES
16"
FINISHED
WALLS
2 " WASTE STUBOUT
21-1/2"
11-5/8"
FINISHED WALL
SURFACE
FINISHED FLOOR
MATERIAL
60"
FINISHED
MINIMUM
IMPORTANT: This is the installed position of
the waste stub-out when connected to the
shower drain. If the stub-out is installed before
the shower unit, leave enough flex in the waste
line to allow the end of the stub-out to be
blocked temporarily (see page 10) in a position
under flush to the floor surface. This will allow
the shower unit to slide across the floor into
position without having to lift it.
IMPORTANT: The shower drain is designed
to connect to a 2 inch (50mm) ABS or PVC (as
approved by local codes/standards) waste
stubout.
End of 2 inch (50 mm) waste stubout must be
located to these dimensions within 1/4 inch
(6mm).
40 "
55 "
FINISHED WALL
SURFACE
*
Stub-out for steam tank drain
down line should be minimum
1/2" copper tubing. Provide
3/4" male pipe thread fitting on
end of copper drain line.
42"
3"
3"
13"
*
This drain line must be
provided for the steam tank
drain to site drain as required
by local codes/standards.
J-Dream II Owner's Manual