8
Locate Base to provide assembly access to all sides
Remove Base from carton labeled Base/Top. Place Clear Top in carton to prevent damage.
(The Clear Top will not be installed until the unit has been fully assembled and plumbed).
Position the J-Dream base on the floor so that you have work access to all four sides of the
unit during assembly. (Allow a minimum of 24" (600 mm) of access on each side of base.)
Before starting assembly, position the base pointing in the same direction as it will be in the
final installation position so no unnecessary turning of the unit is required.
Base
Drain Fitting
Floor cut-out
for drain pipe.
Notice Base is positioned in the
same direction as it will be in
the final installation position.
Niche where J-Dream II is
to be finally installed.
Floor cut-out for
steam tank drain pipe.
J-Dream II Owner's Manual