![background image](http://html1.mh-extra.com/html/jacto/advance-3000-am-18/advance-3000-am-18_operators-manual_3178498043.webp)
43
HYDRAULIC SYSTEM OPERATION
SEQUENCE FOR UNFOLDING AND FOLDING THE BOOMS
There are two ways to actuate the booms unfolding
and folding:
- through electric switches;
- through cables.
Plate fixed on the control (with actuation
through cable) showing the sequence to
unfold and fold the booms.
BOOMS UNFOLDING AND FOLDING
1st - Boom in the rest position.
JEC-3400