35
ASSEMBLING THE BOOMS
1
2
ASSEMBLING THE BOOM
ATTENTION: Tie the booms as shown in the figure in order to aviod accidents when mo
-
ving them and to make easier to assemble them.
- Install the the boom articulation pin (detail 1).
- Install the cylinder coupling end on the boom (detail 2).
- Repeat this operation with the other boom.
- Put about 26.41 gallons of water in the main tank.
- Engage the PTO and keep the engine at half speed (±1300 rpm).
2
1
rope
STICKER
Indication of the hydraulic system operation
(for sprayers with cable control)
Cable control
sticker