B
en-52
Safety, Operation, & Maintenance Manual
OPERATION
Lithium
How to calculate a slope
Tools Required:
Level (A), either ....................... 1 yard, or 1 meter long.
Tape measure (B).......................................................1.
1. With the level
(A)
positioned horizontally, measure the distance
(C)
with tape measure
(B)
.
2. Use the chart to calculate either the slope angle or the % grade of the slope
(D)
.
Fig. 2
Height (C)
Result (D)
Inches with 1 Yard Level (A)
Millimeters with 1 Meter Level
(A)
Slope in Degrees
Slope Grade %
3
4.8
8.3
100
5.7
10.0
150
8.5
15
6
9.5
16.7
200
11.3
20.0
7.5
11.8
20.8
225
12.7
22.5
9
250
14
25.0
275
15.4
27.5
10
15.5
27.8
300
16.7
30.0
11
17.0
30.6
325
18.0
32.5
12
18.4
33.3
350
19.3
35.0
13
19.9
36.1
375
20.6
37.5
14
21.3
38.9
400
21.8
40.0
15
22.6
41.7
425
23.0
42.5
16
24
44.4
475
25.4
47.5
18
500
26.6
50.0
20
29.1
55.6
C
A
B
D
Summary of Contents for ECLIPSE 360
Page 14: ...en 14 Safety Operation Maintenance Manual Notes Lithium SPECIFICATIONS...
Page 18: ...en 18 Safety Operation Maintenance Manual DECALS Notes Lithium...
Page 44: ...en 44 Safety Operation Maintenance Manual CONTROLS Notes Lithium...
Page 62: ...en 62 Safety Operation Maintenance Manual BATTERIES Notes Lithium...
Page 88: ...en 88 Safety Operation Maintenance Manual ADJUSTMENTS Notes Lithium...
Page 146: ...en 146 Safety Operation Maintenance Manual QUALITY OF CUT Notes Lithium...
Page 147: ......