16
07610-004-33-05-B
INSTRUCTIONS
INSTALLATION
Bulkhead Opening for
Conductivity Probe
Drain Connection
Adjustable Feet
Drain Connection
Booster Heater Electrical Opening
(provided on both sides of unit)
Detergent
Connection
Point
Main Electrical Opening
(provided on both sides of unit)
Incoming Water
Summary of Contents for RackStar 44
Page 2: ......
Page 73: ...66 07610 004 33 05 B STEAM BOOSTER HEATER SCHEMATICS...
Page 77: ...70 07610 004 33 05 B SCHEMATICS RACKSTAR SIDE LOADER...
Page 79: ......