9
07610-004-29-29-A
OPERATING INSTRUCTIONS
OPERATION
Before operating the unit, verify the following:
1. The pan strainers and suction strainer are in place and are clean.
2. The standpipe and o-ring are installed.
3. The wash and rinse arms are screwed securely into place and the end-caps are
tight. The wash and rinse arms should rotate freely.
To energize the unit, turn on the power at the service breaker. The voltage should
have been previously verified as being correct. If not, the voltage will have to be
verified.
Press the Power Button and the display will come on. The DynaTemp machine should
fill with water automatically until the appropriate water level is reached (just below
the pan strainers). The wash tub must be completely filled before operating the wash
pump to prevent damage to the component. Once the wash tub is filled, the unit is
ready for operation.
PREPARATION
POWER UP
FILLING THE
WASH TUB
Power Button