![Jackson MSC 10AB-N70 Installation And Operation Manual Download Page 11](http://html1.mh-extra.com/html/jackson-msc/10ab-n70/10ab-n70_installation-and-operation-manual_3162890011.webp)
6
Page Created: 09-10-2012
Technical Manual (07610-003-97-40)
Operating Parameters
Model Designation: 10AB-N70
Operating Capacity:
Racks per Hour
45
Dishes per Hour
450
Glasses per Hour
1215
Tank Capacity (gallons):
Wash Tank
4.5
Rinse Tank
3
Electrical Loads (as applicable):
Wash Motor HP
1/3
Rinse Heater KW (Total)
13.4kW @ 254V
NOTE: Always refer to the machine data plate for specific electrical and water requirements. The
material provided on this page is for reference only and is subject to change without notice.
HOT WATER SANITIZING
Water Temperatures (Fahrenheit):
Minimum Wash Temperature
150
Minimum Rinse Temperature
180
Incoming Water Temperature
110
Other Water Requirements:
Water Flow Pressure (PSIG)
15
Flow Rate Minimum (GPM)
0.97
Water Line Size (NPT)
1/2”
Drain Line Size (NPT)
1-
1/2”
Summary of Contents for 10AB-N70
Page 8: ...Revision Letter Revision Date Made By Applicable ECNs Details...
Page 59: ...APPENDIX A DEMA Nitro Warewash Dispenser A 1...
Page 61: ...Part 1 Nitro Warewash Dispenser User s Manual...
Page 70: ...Part 2 Solid Rinse Bowl Installation Instructions...
Page 75: ...Part 3 Viking Bowl Installation Instructions...
Page 78: ...Part 4 Nitro Warewash Dispenser Training Manual...