
Engine Overhaul Manual
Jabiru Aircraft
Pty Ltd
Jabiru 2200 & 3300 Aircraft Engines
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
ISSUE
1
2
3
4
5
6 7
Dated : 28/10/2014
Issued By: AS
Page: 175 of 201
L:\files\Manuals_For_Products\Engine_Manuals\Overhaul_Manual\JEM0001-7_Overhaul_Manual_DRAFT_(29_10_14).docx
9.9.10 Ground Run-In Procedure
Table 24
– Ground Run-In Procedure
Pre Run-In Checks:
Correct Oil Type & Quantity
All connections secure
Idle Set
Propeller Secure
Time
Duration
(minutes)
Condition
RPM
RPM
CHT 4/6
(100
– 180°C)
Oil Temp
(50
– 118°C)
Oil Pressure
(220
– 525 kPa)
Idle Min 80 kPa
2
Start and Idle
1000 - 1200
4
Hot Idle Check 1
1400
2
Very High Idle
1800
2
High Idle
1400
3
Mid Power
2000
2
High Idle
1600
2
60% Power
2400
2
High Idle
1800
2
70% Power
2600
2
Mid Power
2000
2
75% Power
2800
2
Mid Power
2200
2
85% Power
3000
2
Cooling Run
2000
4
75% Power
2800
2
Mid Power
2000
2
85% Power
3000
3
60% Power
2400
4
85% Power
3000
3
50% Power
2400
3
Takeoff Power
Full
2
60% Power
2600
2
Mid Power
2000
2
Cooling Run
1600
2
Hot Idle Check 2
Idle (800-1100)
O.A.T.
°C
Alternator:
V (AC), ___
V (DC) at 2800 RPM
Magneto RPM Drop Left:
Magneto RPM Drop Right:
Limits: 0
– 100 RPM
Test at 2000 RPM
Use:
Aero Shell 100/Exxon 100/BP Aviation Oil 100
2200
2.2 Litres or 2 Fill Oil Filter
3300 3.4 Litres or 3.2 Fill Oil Filter
Idle Comments:
Top End (RPM) Comments:
Overall Comments:
Any Changes / Adjustments Made During Run:
Post Run-In Checks:
Check for Oil Leaks
Re-Torque Cylinder Heads
Adjust Valves (solid Lifter)
Check Induction / Exhaust
Leak-down
test results
I hereby certify that this engine has been run in accordance with Jabiru requirements including the current
revision of Process Specification TR01 and is fit for use.
Signed:
Date:
for Jabiru Aircraft Pty Ltd
#1
80
#2
80
#3
80
#4
80
#5
80
#6
80