The performance of the Machine has proven
to increase tremendously when its operator
understands the operation of the machine
and knows how to carry out field adjustment
procedures.
In most cases, the operator have can perform
routine checkups and field adjustment procedures
on the Machine, by pulling the Machine to the
hatch. A large, expensive boat isn't necessary.
When tank entry is required, an inflatable raft/boat
(approximately 6 ft) is deployed inside the tank.
It is extremely important that safety comes first
every time the Machine is inspected or having
maintenance procedures performed. It is strongly
encouraged that anyone working on or near the
machine follow these rules:
Wear a personal floatation device
Stay focused and alert
Turn the Machine off before working on it
Stay clear of parts while they are moving
To turn the Machine motor off, turn the On / Off
switch to the off position. To completely power
down the digital controller, remove all power
sources in the proper sequence.
ON / OFF
SWITCH
DIGITAL
CONTROLLER
©2022 IXOM Watercare Inc. | www.ixomwatercare.com | 866 - 437 - 8076 | [email protected]
Maintenance
Maintenance and Field Adjustment
SB / GF PW Series Mixers
10237_20220110
O&M_SB5000PW_10272_20220119 - 33