ICE QUEEN
TECHNICAL SERVICE MANUAL
35
screw.
7) Check for wear inside bearing and replace if more than 0.25 mm.
8) Replace o-rings, add silicone and grease, clean evaporator and reassemble.
IMPORTANT!
Side hole must be aligned with the one in evaporator, otherwise you will not be able to
insert Allen screw in place.
1) Open water faucet and check for leaks.
2) Assemble unit and connect to power source.
3)
IMPORTANT: DISCARD ICE PRODUCED DURING FIRST 15 MINUTES.
7.2. Speed Reducer (Gearbox)
Materials needed:
Extractor
M8 Screws
No.12-13 monkey wrench (2)
No.8-9 monkey wrench
6 mm Allen key
M8 nuts (2)
Procedure:
1) Remove top screw on gearbox.
2) Remove the four screws that hold flange.
3) Remover gearbox using extractor
Assembly:
1) Lubricate motor axle with grease.
2) Place gearbox face up.
3) Screw in (*) screw, place washer and lower gearbox by tightening nut.
WARNING: Do not hammer.
1) Face up clamps socket.
2) Remove (*) screw.
Place washer and tighten until spindle is flush with gearbox axle.
Summary of Contents for GIQ 1100
Page 6: ...ICE QUEEN TECHNICAL SERVICE MANUAL 6 1 4 Wiring diagrams ...
Page 7: ...ICE QUEEN TECHNICAL SERVICE MANUAL 7 ...
Page 8: ...ICE QUEEN TECHNICAL SERVICE MANUAL 8 ...
Page 9: ...ICE QUEEN TECHNICAL SERVICE MANUAL 9 ...
Page 10: ...ICE QUEEN TECHNICAL SERVICE MANUAL 10 ...
Page 11: ...ICE QUEEN TECHNICAL SERVICE MANUAL 11 ...