ICE QUEEN
TECHNICAL SERVICE MANUAL
29
5. OPERATION
5.1. Preliminary Checks
a) Is machine levelled?
b) Are voltage and frequency of mains supply the same as indicated on rating plate?
c) Is drainage system working properly?
d) Is air circulation and room temperature adequate? (Air-cooled models)
AMBIENT TEMPERATURE
WATER TEMPERATURE
MAXIMUM
43°C
35°C
MINIMUM
5°C
5°C
e) Is water pressure adequate?
MAXIMUM
0.7 Kg/cm2
MINIMUM
6 Kg/cm2
ATENTION:
Check that voltage and mains frequency is the same as in the rating plate.
5.2. Starting up
Once preliminary check has been completed (ventilation, connections, temperature, etc.),
proceed as follows:
1. Remove top cover of unit
2. Open faucet, make sure there are no leaks and check that water level is adequate.
4. Set switch to OFF position.
5. Connect unit.
Summary of Contents for GIQ 1100
Page 6: ...ICE QUEEN TECHNICAL SERVICE MANUAL 6 1 4 Wiring diagrams ...
Page 7: ...ICE QUEEN TECHNICAL SERVICE MANUAL 7 ...
Page 8: ...ICE QUEEN TECHNICAL SERVICE MANUAL 8 ...
Page 9: ...ICE QUEEN TECHNICAL SERVICE MANUAL 9 ...
Page 10: ...ICE QUEEN TECHNICAL SERVICE MANUAL 10 ...
Page 11: ...ICE QUEEN TECHNICAL SERVICE MANUAL 11 ...