ICE QUEEN
TECHNICAL SERVICE MANUAL
36
7.3. Upper Flange
Materials needed:
Extractor
PHILLIPS N°2 Screwdriver
M8 Screws (110 mm)
No.12-13 monkey wrench (2)
No.8-9 monkey wrench
4, 5 and 6 mm Allen key
M8 nuts (2)
Procedure:
1) Disassemble gearbox (see previous section)
2) Remove all four screws holding brackets.
3) Remove all three screws that keep plate and evaporator together.
4) Remove gearbox by hand or using extractor.
Assembly:
1) Clean lodging and neck plate.
2) Mount plate.
IMPORTANT:
End of ice discharge flap must be to the right of evaporator's window.
IMPORTANT:
Carefully lubricate seal lips (depending on model), avoid damaging them.
1) Replace the three evaporator/plate screws.
2) Replace brackets.
3) Reassemble gearbox. (see previous section)
7.4. Upper bearing (depending on the model)
Materials needed:
Extractor
PHILLIPS N°2 Screwdriver
M8 Screws (110 mm)
No.12-13 monkey wrench (2)
No.8-9 monkey wrench
4, 5 and 6 mm Allen key
Summary of Contents for GIQ 1100
Page 6: ...ICE QUEEN TECHNICAL SERVICE MANUAL 6 1 4 Wiring diagrams ...
Page 7: ...ICE QUEEN TECHNICAL SERVICE MANUAL 7 ...
Page 8: ...ICE QUEEN TECHNICAL SERVICE MANUAL 8 ...
Page 9: ...ICE QUEEN TECHNICAL SERVICE MANUAL 9 ...
Page 10: ...ICE QUEEN TECHNICAL SERVICE MANUAL 10 ...
Page 11: ...ICE QUEEN TECHNICAL SERVICE MANUAL 11 ...