ILS Strobe Lighting Systems
DOC-3400-MNL Rev23.doc
(9/22/2021)
Copyright 2007-2021 ITL, LLC Page 17
of
86
Installation
The following section describes how to install the strobe lighting system. Based on the
type of system you are going to install please refer to the appropriate wiring diagram in
section
ILS-1400 / ILS-2400 / ILS-3400/ ILS-3800 Installation Wiring Diagram.
Unpacking your Strobe Lighting System
Please examine the shipping containers and their content thoroughly upon receipt and
report any potential shipping damage to the carrier.
Tools for Installation
The following tools are suggested for mounting of the ITL power supply and flash head.
Digital multi-meter capable of reading 600VAC/DC (Fluke 177 or 179)
Nut Drivers and Sockets
#2 Phillips Screwdriver
5/16 Flat Head screwdriver
Crimp Tool
Needle Nose Pliers
Quick Installation Guide
The quick start guide shows how to install the ILS strobe lighting systems. The guide
provides only basic instructions for more details, refer to this document.
Remove packaging material from inside power supply and flash head
Mount the power supply cabinet.
Ground the power supply cabinet to the site grounding system using an AWG6
copper conductor.
Using the mounting holes provided in the bottom of the cabinet ground the power
supply cabinet to the site grounding system using an AWG 6 copper conductor and
a two-hole (5/8” centers) compression lug.
Mount the flash head using the hardware supplied.
Install sidelights (ILS-1400, ILS-3400 & ILS-3800 only)
Connect strobe cable to both, power supply and flash head
Connect PEC
Install strobe tube(s) into flash head
Attach primary power cable
Apply power to unit (pull interlock switch)
Observe red alarm LEDs off
Observe yellow confirm LED blinks every 1.5s in day mode and every 1.5s in night
mode for the ILS-2400 or every 3s in night mode for the ILS-3400 system