INSTALLATION OF SHADING TECHNOLOGY 

We recommend installing the shading technology between the pergola poles, (installation to opening), using 
the  revealed  installation  method.  Installation  between  the  pergola  pole  and  the  building  wall  is  more 
complicated, as regards both measurement and assembly 

 attachment of guide rails to the wall. We do not 

recommend anchoring the guide rails through the 

building’s external insulation. In such cases, it is advis

able 

to  install  the  pergola  pole  near  the  wall  and  anchor  the  guide  rails  of  the  screen  roller  blind  in  this  pole. 
When installing our screen ZIP roller blinds, we recommend to always use guide rails type 838. 

With respect to the dimensions of poles used for the Artosi pergolas (110 

×

 110 mm), we recommend using 

110 mm box when installing screen roller blinds. If a larger box is used and the roller blinds are attached to 
the pergola corner joints, the rear sides of the boxes will collide, and in such a case neither roller blind can be 
installed so that it fits against the outer edge of the perimeter sections! 

If  the  pergola  is  installed  onto  the  building  and  the  screen  roller  blinds  are  ordered  together  with  the 
pergola,  we  recommend  measuring  the  inclination  from  the  building  during  the  initial  measurement.  The 
measured values should then be considered in the order form to specify the accurate height of the screen 
roller blind (difference in the length of the guide rails). 

If  shading  technology  (screen  roller  blinds)  is  to  be  installed  later 

  after  the  supply  of  the  pergola 

  it  is 

necessary to carefully  consider  the  installation of wiring. It is necessary to carefully  choose  the position of 
drilled holes  in order not  to damage  the  water draining chambers. If the  situation so requires, cables may 
also be installed on the upper surface of the perimeter section. 

 

Summary of Contents for ARTOSI

Page 1: ...ricity connections integration of the pergola to the house etc When the pergola is mounted properly slats dropping is made in direction from the motor to the other side Water drainage has to be thus a...

Page 2: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 2 Variant B Variant C...

Page 3: ...at least concrete feet have been prepared in advance or a flat surface is available to which the pergola is to be installed The recommended minimum foot dimensions are 300 300 mm frostproof depth A 1...

Page 4: ...pole A1 and pole C1 so that the pre installed 6HR screws fit in the grooves Tighten the pre installed 6HR screws on both sides of the perimeter section A1C1 A 10 Insert two cup head bolts M10 20 to ea...

Page 5: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 5 GROUND MOUNTING variant A FIGURES TO ILLUSTRATE THE ABOVE ACTIVITIES...

Page 6: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 6...

Page 7: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 7...

Page 8: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 8...

Page 9: ...tallation of the pole A3 and pole C3 Then proceed in accordance with items A 1 through A 4 above B 3 Insert the perimeter section A1A3 to the pre installed pole A3 and press it against the wall mounti...

Page 10: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 10 Wall Mounting Variant B figures to illustrate the above activities B5 B6...

Page 11: ...n both sides of the pergola and the flatness of the perimeter section C 2 Remove the eaves gutter from the perimeter section A1A3 the gutter is not treated with sealing compound at the lower side C 3...

Page 12: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 12 WALL MOUNTING VARIANT C FIGURES TO ILLUSTRATE THE ABOVE ACTIVITIES C3...

Page 13: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 13 C6...

Page 14: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 14 STRUCTURAL PARTS TO BE TREATED WITH SEALING COMPOUND Silicone gutter corner...

Page 15: ...al junction box is located in the section A1 A3 or C1 C3 together with the motors and ensures 220 V power supply for the motors and LED lighting unit The junction box can be removed if necessary to pa...

Page 16: ...DIFFER ACCORDING TO THE METHOD OF CONTROL NUMBER OF MOTORS AND INSTALLED TYPE OF LIGHTING Multi motor Pergolas Controls are carried out by Situo 5 Variation io controller or other types of controller...

Page 17: ...nstalling screen roller blinds If a larger box is used and the roller blinds are attached to the pergola corner joints the rear sides of the boxes will collide and in such a case neither roller blind...

Page 18: ...la is delivered with an IO controller the individual motors are paired with the controller and the extreme positions of the motors are set start and end position of the slats If the IO remote control...

Page 19: ...a year in spring and before winter treat the rubber seal with a product designed for this purpose silicone spray etc Continuously remove coarse dirt such as twigs and branches from the slats of the pe...

Page 20: ...NT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 20 Pergola Anchoring Template The through hole is always oriented to the exterior side of the pergola View of the foot from the inner side of th...

Page 21: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 21 3 2022 21 Construction readiness...

Reviews:

Related manuals for ARTOSI